NBCS 2026 — Fire & Life Safety: The Passive Fire Mandate
SP 7:2026 — National Building Construction Standards · Part F · IS 12458:2019 — FIREX Builder Brief 06-3
NBC 2016 stands withdrawn. NBCS 2026 is in force — w.e.f. 30 April 2026.
Every “shall” is now “should” — the order now comes from your State bye-law.
For firestops, NBCS specifies one standard only: IS 12458:2019. Imported FM · UL · ASTM — not specified.
1
Where Part F applies — Clause 1.2
| Part F applies from |
Occupancies |
| 9 m · or 500–750 m² | Assembly · Educational · Storage · Hazardous |
| 15 m · or 500–1,000 m² | Business · Institutional · Mercantile · Mixed use · Industrial G-3 |
| 24 m · or 750 m² | Residential |
| ANY height · over 2,000 m² | Industrial G-1 · G-2 — every plant, every shed |
Also on alteration ≥ 1,000 m² or change of occupancy (Cl. 1.3) — retrofit is inside the mandate.
2
The mandate → Stanvac proof
| The mandate |
Stanvac proof |
| Every penetration — sealed, tested, restored to rating [Cl. 2.32, 3.5.4.4 · IS 12458:2019 · min 120 min]
Every cable, pipe and duct crossing must restore the wall’s rating — fire test plus the mandatory hose stream test. No hose stream pass, no rating. |
- FIREX FM-71 mortar — CBRI 2-hr at 75 mm · load-bearing openings
- FIREX FB 250 — mineral-wool barrier · re-enterable · retrofit & irregular openings
- FM-71 + FB 250 Hybrid — India’s first hybrid firestop · universal, walls & floors
- FIREX putty stick — small gaps · panel & shop-floor entries · 2 hr
- Every opening: 2 hr at the wall + EC 43 spread-stop on crossing cables — tested to 4 hr
|
| Stair & exit enclosures — 120 minutes, every crossing certified [Table 1 · exits: 120 min, all construction types]
The stair is the lifeline — every service crossing it carries its own IS 12458 report. |
- FIREX FM-71 + FB 250 — sealed to 2 hours, certificate attached
- STANVAC CS 70 / DC 52 — enclosure surfaces made non-fuel
|
| Electrical shafts — sealed at every floor [Cl. 3.5.5.1 · IS 12458:2019 · IS 1646]
Cables in a dedicated shaft, sealed floor by floor to the floor’s rating. |
- FIREX EC 43 General — zero flame spread · 240 min
- FIREX EC 7034 — panel internals & thin cables · translucent
|
| Life-safety circuits — must run through the fire [Cl. 3.5.5.2 · fire-proof enclosures or survival cables · IS 16246]
Pumps, lifts, alarm and PA must run while the building evacuates. |
- FIREX EC 43 Survival — IEC 60331-21 · 240 min @ 750°C · CBRI · retrofit where survival cable was never laid
|
| Concealed spaces & finishes — no fuel, classed by test [Cl. 3.5.10 · flame-spread classes per IS 12777]
Ceilings and voids must not feed fire — the tender file shows the class. |
- STANVAC CS 70 — clear intumescent · wood protected
- FIREX DC 52 — coloured fire-barrier coating
|
| The label rule — every rated assembly carries its proof [Cl. 2.29 Note 3 · permanent label · manufacturer named]
Rating, product and manufacturer on a permanent label. Anonymous mastic fails on sight. |
- One CBRI-certified manufacturer — one survey · one spec · one labelled evidence file
|
NBC 2016 demanded the fire stop but never named the test. NBCS 2026 names it: IS 12458:2019 — an Indian Standard. It does NOT specify imported FM, UL or ASTM. The certificate vacuum is closed. Any other certificate needs the fire authority’s separate approval.
Verified against SP 7:2026 Part F (BIS): Clause 1.2 / 1.3; List of Standards Sl. (34) IS 12458:2019. Part F binds through State bye-laws; NBC 2016-based bye-laws stay in force until amended. Verify your State’s edition before tender use.
3
Who to meet
- Architect — the drawing carries the risk; a tested FIREX line is the defence
- MEP consultant — BOQ lines survive only with the IS 12458 report attached
- Fire consultant / NOC desk — CBRI report, read on sight, accepted as-is
- Projects head — from 9 m up and in every 2,000 m² plant: no discretion · 2-hour certified to the specified standard, below the imported price
An unsealed opening turns a fire-rated wall into a chimney.
Part F starts at 9 metres. Fire starts anywhere. Stanvac closes the opening and files the proof.
Substance per SP 7:2026 Part F as published by BIS; lift exact provision text from the edition your State bye-law adopts for tender use.