Keeping People Safe. Protecting Buildings.

GOVERNMENT OF INDIA

BUREAU OF INDIAN STANDARDS

DEPARTMENT OF CONSUMER AFFAIRS · GOVERNMENT OF INDIA

NBCS 2026 · FIRE & LIFE SAFETY

SP 7:2026  |  Part F  |  Established 30 April 2026

National Building Construction Standards 2026 · replaces NBC 2016

Three multi-storey residential towers with landscaped grounds under a blue sky

MULTI-STOREY
BUILDINGS.

SEAL FIRE PATHS.
PROTECT CRITICAL CIRCUITS.

Government guidance.
Stanvac technology. Your gain.

9 APPLICATIONS  /  WALLS · SHAFTS · CABLES · PUMPS · LIFTS · ALARMS

01

CABLE OPENINGS THROUGH WALLS

Cables passing through a broken wall opening; inset AFTER: the opening sealed around the cables

An open cable gap weakens the fire-rated wall.

NBCS 2026 · PART F · 3.5.4.4 · IS 12458:2019

Recommends 120-minute minimum firestopping for
applicable cable/conduit openings.

STANVAC SOLUTION

FM 71 + FB250 HYBRID COMBO

Combines mortar strength + mineral-wool boards for
load-bearing safety and easier cable retrofitting, with the
specified supports.

YOUR GAIN

Contain fire at the opening. Keep cable changes
manageable.

Match the tested assembly. The clause excludes low-voltage services shafts;
confirm the exact application with the fire designer.

02

FLOOR + ELECTRICAL-SHAFT OPENINGS

Cables dropping through an open floor shaft; inset AFTER: the floor opening sealed

An open shaft can carry fire from floor to floor.

NBCS 2026 · PART F · 3.5.5.1

Recommends floor-by-floor distribution-shaft seals matching
the floor’s fire rating.

STANVAC SOLUTION

FM 71 + FB250 HYBRID COMBO

Use the matching 2-hour tested hybrid assembly where
suitable. The mortar-and-board combination allows planned
cable re-entry.

YOUR GAIN

Preserve floor separation. Simplify future cable
additions.

A 2-hour test does not prove a higher rating. Match the floor, services, opening
and seal detail; restore after changes.

03

SUBSTATION + LT-ROOM OPENINGS

Electrical room door beside an unsealed cable-tray wall opening; inset AFTER: the cable entry sealed

A protected electrical room still needs sealed cable
entries.

NBCS 2026 · PART F · 3.5.5.3 + 3.5.5.3.2

Recommends 120-minute separation for specified electrical
rooms and indoor dry-type substations.

STANVAC SOLUTION

FM 71 + FB250 HYBRID COMBO

Seal suitable cable penetrations using the documented hybrid
system. Submit the matching IS 12458 report and installation
detail.

YOUR GAIN

Limit spread from the electrical room into occupied
areas.

Penetration seals complement the rated enclosure. Retain fire doors, required
ventilation and suppression; do not obstruct access.

04

FIRE SPREAD ALONG CABLE ROUTES

Fire and smoke travelling along an overhead cable tray in a plant room; inset AFTER: the coated cable route

A cable route can carry fire beyond the first room.

NBCS 2026 · PART F · 3.5.5.1

Prefers flame-retardant wiring and cabling, with the specified
routing and segregation.

STANVAC SOLUTION

EC 43 GENERAL

Additional protection for suitable existing cable sheaths.
Reported 240-minute IEC 60332-3 flame-spread
performance at 1.6 mm.

YOUR GAIN

Limit flame travel through service routes.

NBCS does not prescribe this coating. Retain specified cables and conduits.
Flame-spread control is separate from circuit survival.

05

FIRE-PUMP POWER FEEDS

Black power cables feeding a fire-pump panel; inset AFTER: the same cables coated grey

A fire pump cannot help when its power feed fails.

NBCS 2026 · PART F · 3.5.5.2(a)

Recommends reliable emergency power and protected supply
routes for fire pumps.

STANVAC SOLUTION

EC 43 SURVIVAL

Propose full-route treatment on an accepted cable system.
Reported 240 min at 750°C, IEC 60331-21; 180 min at
950°C, IS 17505-1.

YOUR GAIN

Help firefighting circuits remain available during
fire.

Obtain design acceptance for the complete system. Coating is not an automatic
substitute for specified fire-survival cables, backup supply or redundancy.

06

SMOKE-CONTROL + PRESSURISATION FEEDS

Cables bending up a column to smoke-control equipment; inset AFTER: the cable run coated

Failed fan and damper feeds can compromise smoke
control.

NBCS 2026 · PART F · 3.5.5.2(b)

Includes pressurisation, smoke venting, dampers and
actuators in emergency-power planning.

STANVAC SOLUTION

EC 43 SURVIVAL

Protect compatible fixed power and control cable routes to the
accepted specification. Include connections, supports and
inaccessible route sections in the survey.

YOUR GAIN

Support the circuits needed to manage smoke.

Preserve fan, damper and control operation. Match the required fire duty and
test conditions; do not coat sensors or mechanisms.

07

FIREMAN’S LIFT + LIFT POWER FEEDS

Lift machine room with traction machine and overhead power cables; inset AFTER: the fixed cables coated

Lift support depends on protected fixed power
circuits.

NBCS 2026 · PART F · 3.5.5.2(c)

Includes fireman’s lifts and other lifts in emergency-power
planning.

STANVAC SOLUTION

EC 43 SURVIVAL

Assess the fixed feeder cables and accepted control routes
for compatible full-length protection. Record cable type,
coating build and required fire duty.

YOUR GAIN

Help maintain the fixed electrical supply to lift
systems.

Obtain lift-OEM and fire-designer acceptance. Do not coat moving ropes or
travelling cables without specific qualification. Ordinary lifts are not evacuation
exits.

08

EXIT SIGNS + EMERGENCY LIGHTING

Stairwell ceiling void with cables above an exit sign and emergency light; inset AFTER: the cables coated

People need visible exits throughout an emergency.

NBCS 2026 · PART F · 3.5.5.2(d, e) + 3.5.6

Includes exit signs and emergency lighting in protected
emergency-supply planning.

STANVAC SOLUTION

EC 43 SURVIVAL

Additional protection for accepted fixed cable routes serving
exit signs, staircases and corridor lighting. Match the complete
cable-and-coating system.

YOUR GAIN

Help keep escape-route lighting available.

Retain the prescribed standby power and lighting system. Check route
segregation, electrical loading and installation details.

09

ALARMS + PA + EMERGENCY CONTROL FEEDS

Fire alarm sounder and detector above cable trays with smoke beyond; inset AFTER: the cables coated

Fire signals and emergency instructions need reliable
circuits.

NBCS 2026 · PART F · 3.5.5.2(f, g, h, j)

Also covers alarms, PA, door holders and
command-centre/security-room lighting.

STANVAC SOLUTION

EC 43 SURVIVAL

Survey compatible power/control cables for additional
protection. Include alarm and PA feeds, door-control supply
and command-centre lighting in the proposal.

YOUR GAIN

Support warning, communication and emergency
control.

Retain required fail-safe operation. Do not coat detectors, sensing cables or
contacts. Confirm system compatibility and complete-route performance.

THE TEST MUST MATCH THE PROTECTION YOU NEED.

180 MIN

EC 43 SURVIVAL

Circuit survival at 950°C
IS 17505-1
Match all required test conditions

240 MIN

EC 43 GENERAL

Flame-spread test
IEC 60332-3
1.6 mm test build

240 MIN

EC 43 SURVIVAL

Circuit survival at 750°C
IEC 60331-21
4-core × 70 mm² XLPE / 1.6 mm

2 HOURS

FM 71 + FB250
HYBRID COMBO

Penetration firestop
IS 12458
Match the tested assembly

Performance figures are reported by Stanvac for specific tested systems. Obtain the matching test report and installation detail. Flame-spread resistance,
circuit survival and penetration fire resistance are different performances.

START WITH YOUR MOST VULNERABLE AREA.

Send cable-route, panel and opening photos.

Ask Stanvac for a site survey, system specification and offer.

GOVERNMENT SOURCE BIS SP 7:2026, Part F: 3.5.4.4; 3.5.5.1-3; 3.5.6; List of Standards F(34). Official government-hosted text. Clause summaries are paraphrased.

PRODUCT DETAILS EC 43 GENERAL / SURVIVAL · FM 71 + FB250 HYBRID COMBO

NBCS provides national guidance; State/local rules and fire-authority conditions govern applicability. Verify occupancy, height, area and adopted edition. Product proposals
require matching system evidence and project acceptance.

Selected sales applications, not a complete fire-safety checklist. Stanvac proposals do not imply government endorsement or whole-facility compliance. AI sector and
application illustrations; “after” shows treatment, not a verified installation or fire-test result. Repair or replace defective cables before coating.

STANVAC CHEMICALS (INDIA) LTD.

15 NOVEMBER 2026

Home Download