Keeping People Safe. Keeping Plants Running.

GOVERNMENT OF INDIA

MINISTRY OF PETROLEUM & NATURAL GAS

PETROLEUM AND NATURAL GAS REGULATORY BOARD

Refinery and gas-processing plant with distillation columns, pipe racks, storage tanks and red fire-water lines

REFINERIES +
GAS PROCESSING.

FIRE SAFETY.
PRODUCTION PROTECTED.

Government guidance.
Stanvac technology. Your gain.

6 APPLICATIONS  /  CABLE ROUTES · JOINTS · OPENINGS · RESPONSE CIRCUITS

01

FIRE SPREAD ALONG CABLE ROUTES

Burning cable tray above electrical panels; inset AFTER: the same cable route with coated cables

Cable insulation can carry fire beyond the first
incident.

Recommends cable fire-retardant coatings and tapes as
passive protection, where required.

STANVAC SOLUTION

EC 43 GENERAL

Coat suitable existing cable sheaths. Reported 240-minute
IEC 60332-3 flame-spread test at 1.6 mm.

YOUR GAIN

Limit flame travel. Reduce the risk of a wider
shutdown.

Select by fire exposure. IEC 60332 flame-spread testing alone does not establish
hydrocarbon-fire suitability.

02

VULNERABLE CABLE JOINTS

Cracked, poorly wrapped cable joint at a terminal; inset AFTER: the repaired and coated joint

Poorly protected joints invite repeat failures.

Avoid joints where practicable; assess and monitor
above-ground joints in hazardous areas.

STANVAC SOLUTION

931B STRIPPEX INTUMESCENT

Added protection on suitable repaired joint exteriors:
insulation, dust and water repellency, and reported
120-minute IEC 60332 flame-spread resistance.

YOUR GAIN

Protect repaired joints. Reduce contamination and
flame spread.

Repair and test first. Use the approved tape + coating system for HT. Coating
does not replace flameproof glands or hazardous-area requirements.

03

OPENINGS THROUGH FIRE SEPARATION

Cables passing through an open, broken gap in a concrete wall; inset AFTER: the opening sealed with a firestop board system

One open cable gap can bypass a fire-separation wall.

Identifies fire-separation walls for substations, transformer
bays and cable galleries as passive measures where required.

STANVAC SOLUTION

FM 71 + FB250 HYBRID COMBO

Mortar strength + mineral-wool boards: load-bearing safety
+ easier cable retrofitting, with the specified supports and
tested assembly.

YOUR GAIN

Preserve separation at cable openings. Ease future
cable changes.

Stanvac penetration-seal proposal. Match the wall rating, opening and services;
a 2-hour tested seal cannot establish a higher wall rating.

04

CONTROL-ROOM CABLE PENETRATIONS

Control-room door beside an unsealed cable opening above a cable tray; inset AFTER: the opening sealed around the cables

Open service gaps weaken a protected control room.

Recommends automatic gas-based detection and
extinguishing for relevant equipment in control rooms and
satellite rack rooms.

STANVAC SOLUTION

FM 71 + FB250 HYBRID COMBO

Added passive protection at cable openings. The hybrid
combines mortar strength + re-enterable mineral-wool
boards.

YOUR GAIN

Help contain fire and smoke around critical control
equipment.

Keep the required suppression system. Fire rating alone does not prove gas
tightness; validate enclosure integrity separately.

05

FIRE-STATION + FIRE-PUMP FEEDS

Fire alarm sounder and cable trays beside a fire; inset AFTER: the same cable trays with coated cables

Fire response depends on its electrical supply.

Requires emergency power for the fire station and fire-water
pump house.

STANVAC SOLUTION

EC 43 SURVIVAL

Additional protection for accepted cable systems. Reported
240 min at 750°C, IEC 60331-21; 180 min at 950°C, IS
17505-1.

YOUR GAIN

Help response circuits remain available during fire.

Retain emergency power and redundancy. Match the complete cable system,
exposure and route to the project specification.

06

CABLES IN HYDROCARBON FIRE ZONES

Cables entering an outdoor electrical enclosure in a process area; inset AFTER: the cables coated

A flame-spread coating is not proof of hydrocarbon
protection.

Cables within the Fire Scenario Envelope require
fireproofing in accordance with API 2218.

STANVAC SOLUTION

EC 43 · PROJECT QUALIFICATION

Submit the proposed system for an engineering review of
exposure, duration and circuit duty. Supply only against
an accepted protection specification.

YOUR GAIN

Specify protection for the actual fire scenario.

The IEC / IS results shown here do not by themselves prove API 2218 suitability.
Hydrocarbon and jet-fire duties need the relevant evidence.

THE TEST MUST MATCH THE PROTECTION YOU NEED.

120 MIN

931B STRIPPEX

Flame-spread test
IEC 60332
Repair joints before coating

240 MIN

EC 43 GENERAL

Flame-spread test
IEC 60332-3
1.6 mm test build

240 MIN

EC 43 SURVIVAL

Circuit survival at 750°C
IEC 60331-21
4-core × 70 mm² XLPE / 1.6 mm

2 HOURS

FM 71 + FB250
HYBRID COMBO

Penetration firestop
IS 12458
Match the tested assembly

Performance figures are reported by Stanvac for specific tested systems. Obtain the matching test report and installation detail. Flame-spread resistance,
circuit survival and penetration fire resistance are different performances.

START WITH YOUR MOST VULNERABLE AREA.

Send cable-route, panel and opening photos.

Ask Stanvac for a site survey, system specification and offer.

Selected applications for covered refineries and gas-processing plants. Confirm facility scope, Fire Scenario Envelope and current project requirements. The shown IEC / IS
results alone do not establish API 2218 or jet-fire suitability.

Selected sales applications, not a complete fire-safety checklist. Stanvac proposals do not imply government endorsement or whole-facility compliance. AI sector and