Coal-fired thermal power plant with boiler house, chimney, coal conveyors and cooling towers

THERMAL
POWER PLANTS.

FIRE SAFETY.
PRODUCTION PROTECTED.

Ministry guidance.
Stanvac technology. Your gain.

10 APPLICATIONS  /  PANELS · CABLES · OPENINGS · SUBSTATIONS

01

CABLE GALLERY WALL OPENINGS

Cable bundle through a broken wall opening with crumbling filler; inset AFTER: the opening sealed with a firestop board around the cables

Open gaps let fire and toxic gases reach other rooms.

CEA SAFETY AUDIT 2022 · 5.1.3(D)(2)

Seal all cable entries and exits to prevent fire and toxic gases
progressing into adjacent rooms.

STANVAC SOLUTION

FM 71 + FB250 HYBRID COMBO

Combines mortar strength with mineral-wool boards for
load-bearing safety and easier cable retrofitting. Match
the tested hybrid to the opening.

YOUR GAIN

Contain fire and smoke. Simplify future cable
changes.

Select the required fire rating and reinstate seals after cable changes.

02

CABLE + SERVICE FLOOR CROSSINGS

Open floor crossing with cables rising through broken concrete; inset AFTER: the floor opening sealed around the cables

An open riser can carry fire from floor to floor.

CEA 2023 · REGULATION 38(3)(iii)

Provide a fire barrier at each floor crossing of cable and
service ducts in covered premises, including industrial
installations.

STANVAC SOLUTION

FM 71 + FB250 HYBRID COMBO

Mortar strength + mineral-wool boards: load-bearing safety
+ easier cable retrofitting. Matching 2-hour tested hybrid
assembly.

YOUR GAIN

Contain floor-to-floor fire spread. Ease cable
changes.

Match the required floor rating and support detail. Keep other services out of
power-cable ducts as prescribed.

03

BASEMENT SUBSTATION BOUNDARIES

Basement substation wall with a fire door and an unsealed cable-tray opening; inset AFTER: the cable opening sealed

A sealed room needs every cable opening protected.

CEA 2023 · REGULATION 46(2)(x)(e)

Where a basement substation is necessary, primary and
secondary cable openings through walls and floors require at
least 2 hours fire resistance.

STANVAC SOLUTION

FM 71 + FB250 HYBRID COMBO

A matching 2-hour tested hybrid combines mortar strength
and mineral-wool boards for load-bearing safety and
easier cable retrofitting.

YOUR GAIN

Protect the room boundary. Simplify cable
retrofits.

Other prescribed wall, door, access, cable and oil-containment provisions also
apply.

04

FIRE SPREAD ALONG CABLE GALLERIES

Fire and smoke spreading along cables on a gallery cable tray; inset AFTER: the gallery cables coated

A cable fire can trip more than one generating unit.

CEA SAFETY AUDIT 2022 · 5.1.3(D)(3)

Provide the prescribed fire detection, alarm and protection
systems in cable galleries.

STANVAC SOLUTION

EC 43 GENERAL

Added passive protection for sound cable sheaths. Reported
240-minute IEC 60332-3 flame-spread test at 1.6 mm.

YOUR GAIN

Limit flame travel. Reduce exposure of adjoining
cables.

The coating complements required gallery fire systems. Flame-spread testing
does not establish circuit survival.

05

ESSENTIAL AUXILIARY CIRCUITS

Damaged, charred cables on a cable tray near motors and panels; inset AFTER: the cables coated

Failed cables can disable essential systems.

CEA BOP DESIGN GUIDELINE · 8.2.7.1

Specify fire-survival cables for identified essential duties,
including fire alarms, DC switchgear supplies, battery feeds
and emergency lighting.

STANVAC SOLUTION

EC 43 SURVIVAL

Retrofit proposal for approved cable systems: 240 min at
750°C to IEC 60331-21; 180 min at 950°C to IS 17505-1.

YOUR GAIN

Help essential circuits remain available during fire.

Submit the matching full-system report for project acceptance. Coating is not an
automatic substitute for specified FS cables.

06

PANELS + SMALL WIRING

Rodent-bitten red, yellow and blue control wires inside a panel; inset AFTER: the wiring coated and protected

One bitten control wire can interrupt generation.

CEA 2023 · REGULATION 14(1)

Protect and maintain electrical lines and apparatus for safe
operation under the installation’s environmental conditions.

STANVAC SOLUTION

EC 7034 + FBS 73

Stanvac’s added protection: flexible, translucent anti-rodent
cable coating and reopenable entry-gap sealing. Wire colours
remain visible.

YOUR GAIN

Reduce pest-related faults and contamination
entry.

CEA does not prescribe these products. Repair damaged wiring first; preserve
ventilation, contacts and clearances.

07

CABLE JOINTS + CONNECTIONS

Cracked, peeling cable joint at a terminal lug; inset AFTER: the repaired joint coated

Damaged joint protection can lead to a breakdown.

CEA 2023 · REGULATION 14(1)

Maintain electrical apparatus with sufficient insulation and
mechanical strength for its duty and environment.

STANVAC SOLUTION

931B STRIPPEX INTUMESCENT

Flexible insulation + dust and water repellency on suitable
repaired joints. Reported 120-minute IEC 60332
flame-spread test.

YOUR GAIN

Protect repaired joints against contamination and
flame spread.

Correct electrical defects first. For HT, follow the approved 955 SL tape + coating
system; preserve required clearances.

08

TRANSFORMER FIRE BARRIERS

Cable route into a wall beside transformers and their fire-barrier walls; inset AFTER: the cables and opening protected

Unprotected cable routes can bypass separation.

CEA 2023 · REGULATION 46(2)(vii)(a)

For oil-filled apparatus above 2,000 litres, provide
separation/fire-barrier walls as prescribed, considering the
adjacent building’s fire rating.

STANVAC SOLUTION

EC 43 + FM 71 + FB250 HYBRID COMBO

Protect cable routes and openings. The hybrid combines
mortar strength and mineral-wool boards for load-bearing
safety and easier cable retrofitting.

YOUR GAIN

Help prevent a transformer incident spreading
along cables.

Wall design is separate plant scope. Any penetration seal must preserve its
required rating; 2 hours is not 4 hours.

09

TRANSFORMER FIRE RESPONSE

Cable feeds entering a transformer response-system enclosure; inset AFTER: the feeds coated and the entry sealed

Response equipment also depends on its cable feeds.

CEA 2023 · REGULATION 46(2)(ix)

Provide automatic firefighting for transformers rated 10 MVA
and above and reactors rated 10 MVAR and above.

STANVAC SOLUTION

EC 43 SURVIVAL +
FM 71 + FB250 HYBRID COMBO

Protect response-system feeds and entries. The hybrid
combines mortar strength and mineral-wool boards for
load-bearing safety and easier cable retrofitting.

YOUR GAIN

Help keep response circuits available when needed.

Automatic detection and firefighting must still be designed, installed, maintained
and tested.

10

FIRE DETECTION + ALARM CIRCUITS

Fire alarm sounder and detector above cable trays with a fire in the background; inset AFTER: the alarm cable routes coated

Early detection is useful only if the signal gets
through.

CEA SAFETY AUDIT 2022 · 5.1.2(3, 5)

Provide the prescribed automatic detection and alarm
systems, with strategic manual call points integrated into
fire-control monitoring.

STANVAC SOLUTION

EC 43 SURVIVAL

Protect selected compatible signal and supply cable routes
with a tested circuit-survival system, coordinated with the
fire-system designer.

YOUR GAIN

Support alarm continuity and a timely fire
response.

Do not coat LHS sensing cable or detector elements. Detectors, controls, power
redundancy and drills remain essential.

THE TEST MUST MATCH THE PROTECTION YOU NEED.

0 BITES

EC 7034

30-day rodent test
RDSO/SPN/204
120-min flame test at 1.5 mm

240 MIN

EC 43 GENERAL

Flame-spread test
IEC 60332-3
1.6 mm test build

240 MIN

EC 43 SURVIVAL

Circuit survival at 750°C
IEC 60331-21
XLPE 4-core × 70 mm² / 1.6 mm

2 HOURS

FM 71 + FB250
HYBRID COMBO

Hybrid firestop barrier
IS 12458
Match the tested assembly

Performance figures are reported by Stanvac for specific tested systems. Obtain the matching test report and installation detail. IEC 60332 flame-spread
resistance is different from IEC 60331 circuit survival.

START WITH YOUR MOST VULNERABLE AREA.

Send panel, cable-route and opening photos.

Ask Stanvac for a site survey, system specification and offer.

CEA SOURCES Safety & Electric Supply Regulations 2023 · Thermal Plant Safety Audit, January 2022 · BOP Design Guideline, §8.2.7.1. Regulations, audit
recommendations and project design guidance have different scope.

PRODUCT DETAILS PCO / EC 43 / EC 7034 / FBS 73 · FM 71 + FB250 HYBRID COMBO · 931B STRIPPEX

Selected electrical-fire applications, not a complete plant fire-safety checklist. Stanvac proposals do not imply ministry endorsement or whole-plant compliance. Confirm site
applicability, current requirements and approved system details. AI plant and application illustrations; “after” shows treatment, not proof of a real installation or fire-test
result. Repair or replace defective cables before coating.

STANVAC CHEMICALS (INDIA) LTD.