Cable gallery damaged.
Leaking hot metal from a torpedo ladle triggered fire. Controlled in about 90 minutes; no casualties reported.


Leaking hot metal from a torpedo ladle triggered fire. Controlled in about 90 minutes; no casualties reported.
Fire damaged electrical and electronic equipment in the slag-boiler area. No deaths reported; an internal inquiry was ordered.
Equipment failure near blast furnace 8 was followed by fire. Coal-handling and electrical equipment were damaged. Casualty count unconfirmed.
Fire can disable the cables powering safety systems.
Tested protection to help keep circuits working during fire.
Tests & application requirements REQUEST A QUOTATIONA blast and fire in the associated power unit killed three engineers and seriously injured a worker.
Explosion, molten-steel spill and fire. The 14 June report recorded eight deaths and six injuries, citing officials and RINL.
Turbine-unit blast and fire in the associated power station injured seven people.
Residual material burned in an isolated pipeline during maintenance. Smoke inhalation hospitalised 23 workers; the plant reported no gas-leak indication.
Fire in the caster 6 water-and-air tunnel burned four contract workers.
Blast and fire during dismantling of a non-operational coke unit. Three minor injuries; the company reported no production impact.
Tar-distillation fire. The Ministry of Steel reported no casualties or property loss.
Coke-oven gas-pipeline explosion during maintenance. A later CAG-audit report recorded 14 deaths and criticised safety arrangements.
Selected reports; figures follow the linked sources. These incidents do not establish EC 43 performance.