Cable gallery damaged.
The fire service recorded a 24-hour response. Crews protected Units 3-5. No deaths reported.


The fire service recorded a 24-hour response. Crews protected Units 3-5. No deaths reported.
A control-room fire shut Unit 5. No casualties reported; Mumbai's supply was unaffected. Cause under investigation.
Fire spread to mills and other equipment. No casualties reported; a short circuit was suspected.
Fire can disable the cables powering safety systems.
Tested protection to help keep circuits working during fire.
Tests & application requirements REQUEST A QUOTATIONA coal-loading-bunker blast triggered fire. Five workers injured, two seriously. Cause and damage unconfirmed.
Roof collapse during a lightning storm was followed by turbine, control and boiler-area fires. Two minor injuries; lightning link under investigation.
Boiler-feed-pump fire damaged key components. No casualties reported; an oil leak was suspected, not confirmed.
Two 315 MVA transformers burned; two 200 MW units tripped. No casualties reported. Fire controlled in about 90 minutes; generation restored.
Transformer fire damaged equipment and shut the 210 MW Unit 4. Cause and loss under assessment.
Coal-conveyor fire prompted Unit 3 shutdown. One CISF responder sustained minor injuries; five other units kept operating.
Three fire tenders responded. The report did not identify the affected equipment, injuries or cause.
A burst and fire near a lignite-bunker valve killed one worker and injured four in the initial report.
Coal-conveyor fire affected generation. Repairs continued two days later; an electrical fire audit was ordered. Injury count unstated.
Coal-conveyor fire interrupted production. Fire controlled in about two hours; cause and injuries unspecified.
Shutdown-work fire and explosion killed 15, according to December follow-up reporting. An NGT committee linked smouldering lignite, water-gas formation and process-safety failures.
Boiler explosion and fire stopped Unit 6. Initial report: eight injured.
Conveyor fire preceded the separate 7 May boiler incident. Damage and injury counts unspecified.
Turbine-generator blast and fire injured four engineers and stopped generation at the 1,000 MW station. Fire controlled in about four hours.
Plant fire drew emergency crews. Initial report: no casualties; equipment and cause unspecified.
Switchyard fire damaged electrical equipment and triggered precautionary unit trips. One official suffered burns; a short circuit was suspected.
Turbine burst and fire stopped generation. Six fire tenders controlled the blaze in about two hours. No casualties reported.
Selected reports; figures follow the linked sources. These incidents do not establish EC 43 performance.