FOR HOSPITAL LEADERSHIP

HOSPITAL FIRE SAFETY

MoHFW 2026. Hospital duties. Stanvac protection.

01

Why hospitals face high fire risk

Six lives lost, including a child.

Six lives lost, including a child.

Dindigul, Tamil Nadu. December 2024.

Electrical load

ACs, UPS systems and medical
equipment run continuously.

Oxygen

Leaks or enrichment can accelerate
fire.

Combustible material

Linen, plastics, chemicals and cable
insulation feed fire.

Difficult evacuation

ICU, NICU and OT patients need
assisted transfer.

MoHFW §§1.1, 3.2 and 4.1.2

02

Why hospitals attract rodents

Rodents reach the NICU.

Rodents reach the NICU.

Food: kitchens, ward meals and waste.

Water: leaks and drainage areas.

Shelter: false ceilings and service shafts.

Access: gaps around cables and pipes.

A bite can expose conductors, causing a
short circuit, fire or loss of critical
power.

Combine pest control, entry sealing and cable protection.

Rodent risk factors / Healthcare pest control / Cable damage

03

MoHFW requirements

National guidance released 4 May 2026. Public and private hospitals, including nursing
homes.

Responsibility
Administration accountable. Fire Safety Committee, designated Fire
Safety Officer and approved Fire Safety Plan.
Every 3 months
Risk assessment. Repeat after major structural or functional changes.
Every year
Full fire and electrical audit, or the applicable State/UT frequency.
Always valid
Fire Safety Certificate. Renew before expiry.
Every finding
Fire Hazard Register, audits and verified corrective actions. Name
owners and deadlines. Keep records for regulators and NABH.
Keep ready
Alarms, suppression, clear exits and medical-gas controls. Staff
training, evacuation drills and an annual joint-agency drill.

MoHFW §§2.1–2.3, 3.1–3.3, 4, 5.5, 6.1–6.3 and 7.1–7.2

Consequences for hospital and management

An ICU after the fire.

An ICU after the fire.

SMS Hospital, Jaipur. 2025.

Personal liability

Negligent fire deaths can mean up to 5
years’ imprisonment plus fine.

Commercial exposure

Closure and compensation risk. Lost
income. NABH status, cashless tie-ups
and insurance claims may suffer.

Reputation

Patient trust and referrals can suffer.

Unresolved audit findings can become evidence of negligence.

Consequences depend on findings, applicable rules and policy terms. BNS §§106(1), 125.

AMRI, Kolkata, 2011: 90+ deaths. Directors arrested.

04

Stanvac solutions for each requirement

MoHFW requirement
Stanvac solution and hospital gain

Limit thermal fire
hazards

Annex 1 A3.1(4)

FBS 73 sealant + DC 52 coating

Seal panel entries. Coat internal paint to limit fire spread.

FBS 73: up to 2 hours. IS 12458 tested assemblies.

FBS 73 · Entry sealing

FBS 73 · Entry sealing

DC 52 · Internal panel paint

DC 52 · Internal panel paint

Limit cable flame
spread

§4.1.3 / Annex 1 A4

EC 43 General: large cable runs.
EC 7034: small cables and panel wiring.

EC 43 General: 240 min at 1.6 mm. IEC 60332-3.

EC 43 General · Cable runs

EC 43 General · Cable runs

EC 7034 · Small wiring

EC 7034 · Small wiring

Support safety
services

Annex 1 A4

EC 43 Survival

Keep critical circuits live: pumps, alarms, smoke control and
emergency lighting.

Protect the full critical cable route.

Protect the full critical cable route.

Protect against rodents

Annex 1 A3.1(7): fauna

EC 7034 anti-rodent coating

Translucent, flexible intumescent. Protects insulation and
preserves cable identification.

Protect insulation. Keep cable colours visible.

Protect insulation. Keep cable colours visible.

Z201 Pufseal + EC 7034 topcoat

Small pest-entry gaps with no required fire rating.

Confirm adhesion and rodent resistance on cured foam before specifying this
combination.

Pufseal gap fill with EC 7034 topcoat.

Pufseal gap fill with EC 7034 topcoat.

Seal shafts at every
floor. Audit cable
crossings.

§4.2 / Annex 1 A3.1(2)

FM 71 mortar / FB 250 board / hybrid firestop

Contain fire and smoke for evacuation to an adjoining
compartment. Record make, type, manufacturer’s test report
and installation method.

2-hour tested assemblies. IS 12458. Reinstate seals after cable changes.

FM 71 · Mortar floor seal

FM 71 · Mortar floor seal

FB 250 · Wall barrier

FB 250 · Wall barrier

Non-combustible
structure, finishes and
false ceilings

§4.1.1

CS 70 clear / DC 52 coloured coatings

Use only where the tested substrate/coating system meets the
required classification.

New construction. Existing alterations or identified hazards require authority
review.

CS 70 · Clear finish

CS 70 · Clear finish

DC 52 · Coloured finish

DC 52 · Coloured finish

Application illustrations. Stanvac panels, cables and openings.

Match the tested cable, dry-film thickness and seal assembly. Replace defective wiring. Isolate before
application.

Works with detection, suppression, emergency power and trained evacuation.

05

Why Stanvac

World-first technologies*

EC 7034
19 / 0

Bite marks. Uncoated / coated.
30-day test. RDSO/SPN/204, SAFE.

120-min flame-spread test.
1.5 mm. IEC 60332-3-22, Cat A.

EC 43 SURVIVAL
240 min / 750°C

+ 15 min cooling. IEC 60331-21.
180 min / 950°C. IS 17505-1.

750°C test: 1.6 mm on XLPE
4-core 70 mm² cable.

Test thicknesses are dry film. EC 7034 evidence / Circuit-survival evidence

*Stanvac’s published world-first claims.

The complete electrical fire-defence chain

PANELS
PANELS
FBS 73 + DC 52
CABLES
CABLES
EC 43 + EC 7034
OPENINGS
OPENINGS
FM 71 + FB 250

Application illustrations. Published tests include CSIR-CBRI evidence.

One survey. One specification. One accountable partner.

Since 1994. 5,000+ customers.

Start with ICU, NICU and OT electrical routes.

Joint survey with your Fire Safety Officer and Chief Engineer.
Priority BOQ, test reports and phased installation plan.